EEMC Tower and Mapmt Channel Prinouts

Attached are prinouts with the ratio of ADC-ped=20 to ADC-ped=100/total at what appears to be the optimal time delay for the crates.  For towers I have everything at 40 and 60 ns and for the mapmt I have everything at 40 and 80 ns.