W Projections / 500GeV

W Projections / 500GeV

 

 

  • MACRO (gzipped tar-file)

 

  • BUR figures: RUN 12 + Run 13 (FINAL with LO pdf errors / sys. errors / beam pol. error)

 

 

Projections are available for:

  • Run 12 (85pb-1 / 55%) NOTE: Full Run 12 is only applied to |eta|<1.5
  • Run 12 (85pb-1 / 55%) + Run 13 (165pb-1 / 55%) NOTE: Full Run 12 + Run 13 is only applied to |eta|<1.5
  • Run 13 (165pb-1 / 55%)
  • Decadal Plan (300pb-1 / 70%)

in comparison to Run 9 results and theory curves only. 

Assumptions: Identical assumptions as for Decadal plan projections

Full documentation is available from here!

  • Mid-rapidity (|eta|<1): Run 9 QCD background / Efficiency = 0.65
  • Forward/Backward rapidity (1<|eta|<2): MC QCD background simulations / Efficiency = 0.60

Individual plots