2009 pp200 Fill-by-Fill Status Tables (Updated 09/17/10)
These status tables are generated in the same way as the 500 GeV status tables were (see here and here for a description of the status bits). Plots showing the pedestal correction, RMS, and status of each strip vs. fill for each module (along with the status tables) are available here. The list of fills used is attached below.
Update 09/17/10:
At the EMC meeting on 9/13, some concern was expressed over certain fills where the calculated pedestal corrections were large for some modules. For four fills -- 10778, 10781, 10854, 10855 -- all the calculated pedestal corrections were large because I was using the wrong pedestal file and had accidentally ended up with a bad file; they could be fixed by switching to the correct pedestals. For other fills, only occasional modules had large pedestal corrections: these were from fills where the pedestals were good enough to pass our quality checks but were bad for a small number of modules. In that case the large pedestal correction is appropriate. Finally, there were a handful of cases where the pedestal correction obtained was large and negative: these strips were marked as bad. The plots and tables at the third link above have been updated to reflect these changes.