fisyak's blog - Runs XIX and XX fixed Target dE/dx calibration has been done. - June 27., 2023
- Runs XXI fixed Target dE/dx calibration has been done - September 17., 2023
- SAMPA V3 Specification - January 26., 2023
- Sector 20 Alignment (iTPC) - March 25., 2018
- Solution of HFT alignment geometry problem - August 8., 2017
- STAR beam line parameters evolution versus time - July 22., 2012
- STAR magnet geometry update - January 28., 2014
- STAR TPC coordinate transformations (T0?) - March 4., 2021
- Static TPC distortion/alignment (update) - February 17., 2015
- Static TPC distortion/alignment study - June 25., 2014
- Static Tpc Distortions study (present status). - May 28., 2014
- Status of dE/dx calibration for pp 500 (transverse) and 19.6 GeV BES, Run XI - May 31., 2011
- Status of the express production of Run XXI - August 4., 2021
- Status of VMC application for HFT embedding - October 31., 2017
- Study of effect Tpc hit errors obtained from TpcRS on quality Cosmic track reconstruction (2010 data) - July 13., 2012
- Summary of dE/dx calibration for Run XIX - December 4., 2019
- Summary of Run XX express production, ROOT6, calibration and analysis plans. - March 22., 2020
- Systematics in momentum between MC and RC due to removed SVT - November 2., 2010
- TbyT analysis of 7p3GeV_fixedTarget_2020 file reconstructed with SL21d and SL23e - December 9., 2023
- Test dN/dx fit with gradient - December 11., 2017
- TFG and S&C versions merging (manpower) - June 25., 2020
- TFG and S&C versions merging (manpower) - June 25., 2020
- TFG merging material - October 9., 2020
- TFG progress - August 24., 2020
- The first shot for Super Sector alignment with Cosmic data, Run XI - August 11., 2011
|