xuanli's blog - Rho reconstruction simulation study with FMS+FHC - January 13., 2010
- APS April meeting draft - January 30., 2010
- Detector study 1 - March 15., 2010
- Detector studies 2 - March 20., 2010
- Detector study 3 - March 23., 2010
- Detector studies 4 - March 24., 2010
- Detector ADC studies 1 - March 28., 2010
- Detector ADC studies 2 - March 30., 2010
- Detector gain studies 1 - April 1., 2010
- Detector ADC distribution studies 3 - April 2., 2010
- ESMD raw ADC distribution - April 13., 2010
- ESMD raw ADC distribution with multi data files - April 13., 2010
- The ESMD pedestal status check - April 22., 2010
- ESMD run08 pedestal check - April 26., 2010
- ESMD pedestal status in one run cross check - April 26., 2010
- ESMD pedestal status check with run 9059045 and run 9061019 - April 26., 2010
- ESMD number of transition strips run dependence studies - April 27., 2010
- ESMD raw ADC cross check - April 29., 2010
- ESMD pedestal cross check update - April 30., 2010
- ESMD pedestal status in run08 pp data - May 3., 2010
- ESMD run08 pedestal staltus check - May 6., 2010
- ESMD pedestal raw ADC sum distribution - May 7., 2010
- ESMD raw adc with cuts 1 - May 9., 2010
- EEMC tower SMD raw adc studies - May 17., 2010
- ESMD raw adc distribution with related EEMC tower adc cut - May 26., 2010
|