xuanli's blog - EMC simulaiton bbc in dAu - May 31., 2011
- EMC threshold studies - February 22., 2011
- EMC threshold study update - March 3., 2011
- EMC tower threshold in triggered/MB simulation/data - March 10., 2011
- EMC tower threshold scan - February 25., 2011
- EMC triggered data/simulation tower threshold studies - March 6., 2011
- EMC underlying studies - April 29., 2011
- ESMD MIP calibration 1 - May 28., 2010
- ESMD number of transition strips run dependence studies - April 27., 2010
- ESMD pedestal cross check update - April 30., 2010
- ESMD pedestal raw ADC sum distribution - May 7., 2010
- ESMD pedestal status check with run 9059045 and run 9061019 - April 26., 2010
- ESMD pedestal status in one run cross check - April 26., 2010
- ESMD pedestal status in run08 pp data - May 3., 2010
- ESMD raw ADC cross check - April 29., 2010
- ESMD raw ADC distribution - April 13., 2010
- ESMD raw ADC distribution with multi data files - April 13., 2010
- ESMD raw adc distribution with related EEMC tower adc cut - May 26., 2010
- ESMD raw adc with cuts 1 - May 9., 2010
- ESMD run08 pedestal check - April 26., 2010
- ESMD run08 pedestal staltus check - May 6., 2010
- FGT HV slow control test - 20130329 - March 29., 2013
- FGT aseembly status - 20120720 - July 20., 2012
- FGT assembly status - 20120713 - July 13., 2012
- FGT assembly status -20120726 - July 26., 2012
|