HFT Sub-system PXL


(Credit Berkeley Lab - Roy Kaltschmidt,
Copyright Notice:

The PXL documentation primarely exsits on Leo Greiner's rnc webpage.
The content here primarely reflect a copy of content on that page and reports that has been circulated in the HFT group
See rnc.lbl.gov/hft/hardware/docs/ for full listing

Internal Reports:

2015

PXL removal procedure (Rahul Sharma + Bob Soja)

PXL run-14 damage report (G.Conti, L.Greiner)

2014

Operation

PXL expert instruction manual (June 2014)

Commisioning

QA plots from runs
http://portal.nersc.gov/project/star/sss/protected/Run14QA/

PXL insertion 

Insertion checklist  south (HW) 1/25/14
insertion checklist  north


Technical information

Additional PXL sensor testing  (3/30/14) LG  word file
PXL temperature interlock (4/7/14   ) LG,MS, HW  word file

PXL vibration and stability Howard Wieman (1/7/14) pdf

Final sector model and survey points for PXL sectors by Jo Silber for run-14 sectors  pdf


2013



Engineering  run:
  • PXL DAQ format word document  (version 6/6/2013)
  • pixel engineering run preparations, L.Greiner 04/23/2013 (word document)
  • Report on sensor failures during engineering run 09/13/2013 (pdf document)

mechanical:

Pixel insertion procedures with updated models
        - Howard Wieman powerpoint

PXL ladder assembly Problems and Lessons Learned , L.Greiner 03/06/2013 (docx)



Electric:

Temperature measurements on Ladder H.Wieman et.al. (pdf)
2012

Electric:


Mechanical:

Mechanical and dicing thinning yield 5 wafers ultimate-2
             - Leo Greiner draft document

Draft document for PIXL survey November 2012
             - Joe Silber  document

Insertion test instructions October 2012
             -   Howard Wieman document

Sensor and ladders dimensions October 2012. Design, layout of sensors and ladders, messurements
             - Joe Silber document

2011

PXL connectivity document v1.8 September 2011
            - Leo Greiner document

2010