HFT Sub-system PXL
(Credit Berkeley Lab - Roy Kaltschmidt,
Copyright Notice:
© 2013 The Regents of the University of California, Lawrence Berkeley National Laboratory)
The PXL documentation primarely exsits on Leo Greiner's rnc webpage.
The content here primarely reflect a copy of content on that page and reports that has been circulated in the HFT group
See rnc.lbl.gov/hft/hardware/docs/ for full listing
Internal Reports:
2015
PXL removal
procedure (Rahul Sharma + Bob Soja)
PXL run-14
damage report (G.Conti, L.Greiner)
2014
Operation
PXL expert instruction manual (June 2014)
Commisioning
QA plots from runs
http://portal.nersc.gov/project/star/sss/protected/Run14QA/
PXL insertion
Insertion checklist south (HW) 1/25/14
insertion checklist north
Technical information
Additional PXL sensor testing (3/30/14) LG
word file
PXL temperature interlock (4/7/14 ) LG,MS, HW
word file
PXL vibration and stability Howard Wieman (1/7/14)
pdf
Final sector model and survey points for PXL sectors by Jo Silber for run-14 sectors pdf
2013
Engineering run:
- PXL DAQ format word document (version 6/6/2013)
- pixel engineering run preparations, L.Greiner 04/23/2013 (word document)
- Report on sensor failures during engineering run 09/13/2013 (pdf document)
mechanical:
Pixel insertion procedures with updated models
- Howard Wieman
powerpoint
PXL ladder assembly Problems and Lessons Learned , L.Greiner 03/06/2013 (
docx)
Electric:
Temperature measurements on Ladder H.Wieman et.al.
(pdf)
2012
Electric:
Mechanical:
Mechanical and dicing thinning yield 5 wafers ultimate-2
- Leo Greiner draft
document
Draft document for PIXL survey November 2012
- Joe Silber
document
Insertion test instructions October 2012
- Howard Wieman
document
Sensor and ladders dimensions October 2012. Design, layout of sensors and ladders, messurements
- Joe Silber
document
2011
PXL connectivity document v1.8 September 2011
- Leo Greiner
document
2010