Event Plane Detector

 

Event Plane Detector group:

  • Daniel Cebra (Davis)
  • Xin Dong (LBNL)
  • Geary Eppley (Rice)
  • Frank Geurts (Rice)
  • Mike Lisa (OSU)
  • Bill Llope (WSU)
  • Grazyna Odyniec (LBNL)
  • Robert Pak (BNL)
  • Alex Schmah (LBNL)
  • Prashanth Shanmuganathan (Kent)
  • Subhash Singha (Kent)
  • Mikhail Stepanov (Purdue)
  • Xu Sun (LBNL)
  • Aihong Tang (BNL)
  • Jim Thomas (LBNL)
  • Isaac Upsal (OSU)
  • Fuqiang Wang (Purdue)
  • Wei Xie (Purdue)
  • Rosi Reed (Lehigh)

Available R&D funds: 30k

R&D proposal: http://www.star.bnl.gov/protected/heavy/aschmah/EPD/STAR_R_and_D_proposal_EPD.pdf

Task Responsible
person
Timeline Resources
needed
GEANT4 simulation

  • Detector response function (input of different particles,
  • energies, angles, scintillator materials, scintillator
  • geometries, etc.)
  • Do we need wave length shifting fibres?
  • Light guides.
Issac Upsal (OSU), Alex Schmah (LBNL) 08/14 - 09/14 none
Tile geometry optimization

  • Minimizing the amount of different tiles.
  • Event plane resolution for new geometry.
  • Centrality resolution for new geometry.
Subhash Singha (Kent)
Mikhail Stepanov (Purdue)
09/14 - 10/14 none
Radiation tests of SiPMs

  • Estimation of expected radiation for BES II.
  • Comparison to BNL radiation tests (Akio).
  • Setup of radiation test for prototope detector.
Daniel cebra (UCD)    
Specifications of scintillators

  • Compare scintillator specs. 
  • Survey of possible vendors.
     
Specifications of SiPMs

  • Compare SiPM specs.
  • Survey of possible vendors.
  • Survey of what other experiments have used.
     
Setup of readout system

  • Simple readout system for basic tests.
  • Advanced readout system for prototype.
  • QT boards, PXL readout,...
     
Setup of basic test system

  • Cosmic tests.
  • Test of readout system.
  • Comparison to GEANT4 simulation.
 Mikhail Stepanov (Purdue)    
Development of wrapping technique

  • Optimized for  about 2000 tiles.
     
Development of techniques to install wave length shifting fibres

  • + connection to light guides and/or SiPMs
     
Mechanical construction for prototype

  • Two sector prototype.
     
Integration into STAR trigger system

  • Survey of requirements.
  • Contact STAR trigger group.
     
Trigger requirements (simulation/calculation)

  • For fixed target collisions.
  • Background suppression.
Daniel Cebra (UCD)    

Observable/Trigger Detector specification
v1  
v2  
v3  
HBT  
Fixed target  
Centrality  

EPD Conference Files

EPD presentations and posters for various conferences

EPD meeting page

This is the page for the EPD meetings. I suppose we could add a subpage for each individual meeting, that way only files relevant to that meeting would appear there.

Isaac, work faster!

EPD meeting April 13, 2016

Agenda copied from Alex's email:

Hi All,
 
We have a brief EPD meeting today to discuss:
 
- EPD review: To do (so far)
 
- Fiber to SiPM coupling (status)
 
- aob
 
Best,
 
Alex

Attached is Isaac's talk on the SiPM board design.

EPD meeting April 20, 2016

EPD meeting April 20, 2016

Hi All,
 
We have our EPD meeting today:
 
- Review report: Summary and to do
 
- How to proceed with the proposal (to be submitted by May 5th)
 
Best,
 
Alex
 
 
 
Title:          STAR Event Plane Detector Meeting
Description:
Community:      STAR
 Meeting type: Open Meeting (Round Table)

 Meeting Access Information:
        SeeVoghRN Application
http://research.seevogh.com/joinSRN?meeting=MsMiMI2n2vDlD9989IDt9s
        Mobile App :  Meeting ID: 101 3768   or  Link:
http://research.seevogh.com/join?meeting=MsMiMI2n2vDlD9989IDt9s

EPD meeting August 10, 2016

 

EPD meeting July 20, 2016

 

EPD meeting July 20, 2016

 

EPD meeting July 20, 2016

 

EPD meeting July 20, 2016

 

EPD meeting July 20, 2016

 

EPD meeting June 22, 2016

 

EPD meeting June 22, 2016

 

EPD meeting October 12, 2016

 

EPD meeting October 12, 2016

 

EPD meeting October 12, 2016

 

EPD meeting October 12, 2016

 

EPD meeting October 12, 2016