Start-of-run EPD tasks and instructions
At the beginning of every run, there are a number of things that need to be done for the EPD.
After the EPD is installed, and before beam, you need to:
- Check mapping from "TUFF space" to "StEvent space"
- Check connector orientations
- Check that you're in the right pre-post
- Compare dark currents to before the shut down
After beam comes, you need to:
- Re-confirm pre-post (same as above)
- Do timing scan (this needs to be done for physics to be declared!)
- Do bias voltage scan (this can be done after physics is declared)