Start-of-run EPD tasks and instructions

 At the beginning of every run, there are a number of things that need to be done for the EPD.

After the EPD is installed, and before beam, you need to:
After beam comes, you need to:
  • Re-confirm pre-post (same as above)
  • Do timing scan (this needs to be done for physics to be declared!)
  • Do bias voltage scan (this can be done after physics is declared)