Run 19 Calibrations
Run 19 Calibrations
19.6 GeV Calibrations
- VPD Calibration QA
- BTOF alignment
- BTOF T0
- Comments:
- BTOF slewing and Local-Z re-used from past full calibration (Run16)
- calalgo=1 (startless mode, VPD is not used for the BTOF start time)
Fixed Target Calibrations
200 GeV Calibrations
- VPD Calibration QA
- BTOF alignment
- BTOF T0