(Weekly update from production team)
1. Data production
BES-II production
(1) Run19 19.6 COL - done
(2) Run19+20 31.2 FXT (7.7) > Run19 4.59 FXT (3.2) - done
(3) Run19 200 COL - done (Assessing whether a second pass with UPC vertex finder is needed)
(4) Run21 7.7 COL - done
(5) Run20 5.75 FXT (3.5) > (Run19+20) 7.3 FXT (3.9) > Run20 9.8 FXT (4.5) > Run20 13.5 FXT (5.2) > Run20 19.5 FXT (6.2) - done
(6) Run19 14.6 COL - done > Run20 11.5 COL - done > Run20 9.2 COL - done
(7) Run21: 200 GeV O+O (including st_upc) - done
(8) Reproduction with SL23 (SL23d - updated dE/dx fixing low pT dE/dX) for Run19 19.6 COL - done
(9) Reproduction with SL23 (SL23d - updated dE/dx, eTOF): Run19 4.59 FXT (3.2), Run20 5.75 FXT (3.5), (Run19+20) 7.3 FXT (3.9), Run20 9.8 FXT (4.5), Run19+20 31.2 FXT (7.7) - done
(10) Run21 17.3 COL - done
(11) Reproduction with SL23 (SL23d - updated dE/dx) for Run19 14.6 COL - done
(12) Run21 200 GeV d+Au (only days 183 - 188) - done
(13) Reproduction with T0 fix for ETOF for Run20 FXT (SL23e) - done for Run20 5.75 FXT (3.5), (Run20) 7.3 FXT (3.9), Run20 9.8 FXT (4.5).
(14) Reproduction of FXT datasets from Run19+Run20 with SL24a (fix for tracking acceptance issue + ETOF update for status flag and partial readout) - done
(15) Run 22 st_fwd stream (with only the raw data from FCS, sTGC and FST) - done
(16) FXT datasets from Run21 [Run21 3.85 FXT I (3.0) > 3.85 FXT II (3.0) > (Run20+21) 26.5 FXT (7.2) > 44.5 FXT (9.2) > 70 FXT (11.5) > 100 FXT (13.7)] with SL24a (fix for tracking acceptance issue, no ETOF calibration) - done
(17) Current Priorities: Reproduction of FXT datasets (Run19 4.59 FXT (3.2), Run20 5.75 FXT (3.5), (Run19+20) 7.3 FXT (3.9), Run20 9.8 FXT (4.5)) > Reproduction of BES-II COL 19.6 > Calibration productions for Run22 p+p > Reproduction of O + O > Reproduction of Run21 3.85 FXT I (3.0) > Reproduction of Run19+20 31.2 FXT (7.7) > Run22 p+p (st_W > st_physics, st_fwd - to be done when forward tracking is ready) > Reproduction of other FXT datasets > Reproduction of BES-II COL datasets
Run23 priorities: production_AuAu_
Other production
(1) Run17 pp510 st_physics - done
(2) Run17 pp510 st_rp to apply latest space charge correction - done
(3) Run17 pp510 st_dimuon using SL20a or beyond, requested by HF- done
(4) Isobar st_hf, st_mtd, st_upc - done
(5) Run17 pp510 st_fms to include "pp2pp" option - done
Run12 200 GeV Cu+Au
Run05 Cu+Cu: east-west asymmetry in produced data
2. MuDst to picoDst conversion
(1) pp500_production_2017 st_physics, requested by HF - done
(2) pp200_production_2012, P12id-MuDst using SL20b or beyond, requested by JetCorr - done
picoDst PicoVtxMode:PicoVtxVpdOrDefault, TpcVpdVzDiffCut:6, PicoCovMtxMode:PicoCovMtxWrite, PicoBEmcSmdMode:PicoBEmcSmdWrite
(3) Run14 AuAu 200 GeV st_physics with HFT, P16id requested by JetCorr - done
mtdMatch y2014a picoDst PicoVtxMode:PicoVtxVpdOrDefault TpcVpdVzDiffCut:3 PicoCovMtxMode:PicoCovMtxWrite
(4) BES-I data - done
streams: st_physics, st_ht
Chain option: picoDst PicoVtxMode:PicoVtxDefault PicoCovMtxMode:
(5) UU_production_2012 - done
picoDst PicoVtxMode:PicoVtxDefault PicoCovMtxMode:PicoCovMtxWrite PicoBEmcSmdMode:PicoBEmcSmdWrite
(6) Run14 AuAu 200 GeV st_mtd, requested by HF - done
mtdMatch, y2014a, PicoVtxMode:PicoVtxVpdOrDefault, TpcVpdVzDiffCut:3, PicoCovMtxMode:PicoCovMtxSkip
3. PicoDst restoration (MuDst is specified) (Progress report)
4. Embedding