The run scenarios for Run 25 (FY25) to consider:
• 20-week operation (instead of 22-week guidance because 2 weeks already
taken by Run 24)
• 28-week operation assuming we can extend the run. (I will talk to CAD &
EIC about possible a further operation and its consequences).
Timetable for the BUR 2025/26
• End of Run 24 – October 21, 2024
• CAD provides guidance for performance by October 28, 2024
• Experiments finalize and submit the BUR to me/PAC by November 3, 204.
• PAC meets on November 7, 2024