Forward Upgrade Project (face2face meeting)

2015-01-29 13:00
2015-01-30 13:00
America/New York
Thursday, 29 January 2015
BNL 2-219 (Thu) and 3-191 (Fri), BlueJeans Meeting ID: 533739863 [access numbers (888)240-2560 etc.], at 18:00 (GMT), duration : 00:00
Agenda: 

BlueJeans: 
https://bluejeans.com/533739863/6113?ll=en&g=pb5geqdcnzwc4z3poy 
Meeting ID: 533739863

Latest information and material about the project at:
https://drupal.star.bnl.gov/STAR/future/proposals/forward-upgrade-project 


01/29/2015 afternoon 13:00-17:00, BNL 2-219

1) Logistics and proposal procedure/deadlines (Ernst/Zhangbu)
https://drupal.star.bnl.gov/STAR/system/files/proposal_logistics_deadlines.pdf

2) layout and section completions (which sections need to work on) (Ernst)
3) pp/pA physics case from the LoI (Elke)
4) what we will learn from asymmetryic system collisions (Gang/Sergei)
https://drupal.star.bnl.gov/STAR/system/files/gwang%20Learn%20from%20asymmetric%20collisions.pdf

5) mix harmonics, event-shape engineering (Jiangyong)
https://drupal.star.bnl.gov/STAR/system/files/jjia_Forward_summary_0.pdf

6) ridge and flow in small system (Fuqiang)
7) improving eta/s extraction with longitudinal flow correlation measurements (Zhangbu)

01/30/2015 morning 9:00-12:00, BNL 3-191

8) overall project contributing insitutions, management and future development (ALL)
9) FCS technical section, R&D, cost and schedule (Oleg/Huan)
10) FTS technical section, R&D, cost and schedule (Zhenyu/Bernd)
Zhenyu: write-up, slides 

11) work assignments for proposal completion (ALL)
Updated institution list and reading assignment (01/31/2015)

TimeTalkPresenter
13:00FCS discussion, section 4 ( 00:20 ) 1 fileOleg Tsai
13:20fcs, section 4 ( 00:20 ) 1 fileOleg Tsai