FSTAR face-to-face Meeting

2021-04-26 08:00
America/New York
Monday, 26 April 2021
ZOOM, at 12:00 (GMT), duration : 00:00
Meeting details can be found at 
https://indico.bnl.gov/event/11318/

Zoom Meeting Info:

https://bnl.zoomgov.com/j/1615666680?pwd=c0p0L0xSVHZyaXBFMTdZU04wZmV6Zz09

Meeting ID: 161 566 6680

Passcode: fSTAR-f2f

Summary Action items:

FST:

- get a thermal camera to take pictures of the cooling in action
- get a tooling to put the soft tubes on the modules
  extreme care needs to be exercised 
- need to understand the CMN and differential Noise deviation from the measured noise better
  the idea is to have 4 time bins to subtract the common mode noise.
- the interference between fSTAR installation and the iTPC/TPC repair needs to be clarified.

FCS:

- plan for timing setup: we take 1 to 2 days of the O-O running to change the latency by one bunch for the full system, 
   if all works we leave it in, if not we all think and come back to it at the end of the run in July
   —> need to talk to the trigger group
- need to think how we make sure that the power supplies for the EPD splitter are always on or run with the EPD so there is no interference 
  —> need to integrate this requirement in the slowcontrol

- trigger:
   leave some trigger bits open for defining triggers for HI related pp topics.
   need to discuss the OO-run plan in the star OPS management meeting and in the triggerboard meeting

Software:
- new plots on tracking performance (resolution and charge separation)