STAR Protected

Welcome

Speaker : Hans Georg Ritter


Talk time : 09:00, Duration : 00:10

 Practical comments

HFT Technical Committee meeting

2010-05-11 09:00
America/Los Angeles
Tuesday, 11 May 2010
LBNL, 50B-4205 Conference Room, at 13:00 (GMT), duration : 00:00

 Bi-monthly face to face meeting.

 the following audio
bridge will be available:
-----------------------------------------------------------------------
Dates:      5/11/10
Days:      Tuesday
Times:      11:30am   to  9pm.
Participants:  10

Assigned Number:    617-324-7520

Prior to the beginning of your audio bridge you must
share the assigned M.I.T. telephone number shown
above with the participants of the call. Each participant
dials the assigned number at the same time of the
conference and all callers are connected. When dialing
the assigned number from within M.I.T. dial the last five
digits, from outside of M.I.T. dial the full ten  digit
assigned number.
-----------------------------------------------------------------------

We will connect to this bridge from Bates and put the
video microphone next to the audio bridge speaker.
Hopefully this will give sufficient audio quality to LBNL,
otherwise LBNL has to connect also to the audio
bridge.

 

TimeTalkPresenter
09:00Welcome ( 00:10 ) 0 filesHans Georg Ritter
09:10Project Status&overview ( 00:40 ) 2 filesFlemming Videbaek
09:50IST Status ( 00:40 ) 1 fileGerrit vanNieuweunhuizen
10:30Break ( 00:20 ) 0 files
10:50Integration: Overview, review planning ( 01:00 ) 2 filesEric Anderssen
11:50SSD Progress and readout plans ( 00:20 ) 1 fileMicheal LeVine
12:10SSD Mechanical, integration, services ( 00:20 ) 2 filesHoward Matis
13:45PXL Electronics&development ( 00:40 ) 2 filesLeo Greiner
14:25PXL Mechanical ( 00:40 ) 2 filesHoward Wieman
15:05Physics response ( 00:15 ) 1 fileH.G.Ritter
15:20Software, progress, plans ( 00:30 ) 1 fileSpiros Margetis
15:50Break ( 00:30 ) 0 files
16:20Documentation discussion ( 00:20 ) 1 fileFlemming Videbaek
16:40Planning for CD2/3 Discussion ( 01:00 ) 2 filesFlemming Videbaek

AgSTAR parsing failure modes

  Issue

KFParticle for strangeness (K0short and lambda)

I tested KFparticle code on real data for V0's decay : K0s and lambda.

ESMD pedestal raw ADC sum distribution

  I sum the statistics of the run list I used before, and checked the raw ADC distributions.

RBRC Saturation Workshop v3

RBRC Saturation Workshop talk version 3

Chris Perkins

5/12/2010

"J/Psi and Charm at STAR"

ProductionMinBias : second pass

  1. for a summary of changes in the codes, look at these slides : here

ESMD run08 pedestal staltus check

  With the run list of run08 pp data.

Rough Draft Iowa Diffraction

Beam Pipe Material Before BBC

BBC Multiplicity With ZDC : Diffraction

2005 Dijet comparison

deFlorian/Vogelsang Z0 / g Calculations - Input for Run 9 W analysis

Study of Z / Ga

RBRC Saturation Workshop

RBRC Saturation Workshop talk version 2

Chris Perkins

5/12/2010

"J/Psi and Charm at STAR"

pp2pp weekly

2010-05-05 14:00
2010-05-05 15:30
America/New York
Wednesday, 5 May 2010
Physics 1-189, at 18:00 (GMT), duration : 01:30

1. Transport measurement - Todd

2. Calculated transport 1% change in the magnet strength - Phil

3. Luminosity measurement what is the path to the final result - Angelika

4. Other updates - let  me know

Title: pp2pp weekly
Description: pp2pp analysis
Community: STAR
- Password: WeeklyElastic
- Phone Bridge
ID: 59479
Password: 9771

EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
- USA (BNL, Upton, NY)
+1 631 344 6100

 

TimeTalkPresenter
14:00STAR pp2pp Transport Study, a beginning ( 00:20 ) 1 filePhil Pile
14:30Update ( 00:20 ) 1 fileKin Yip

BSMD Calibration Update 5/5

Figure 1: Eta distribution of tracks from 500 GeV calibration trees, with the only cuts imposed |Vertex z|<60 and vertex rank>0.

ICHEP2010 abstract on W production at STAR

Response to PRD referee comments on Upsilon Paper

First Round of Referee Responses

Click here for second round.

STAR Management Meeting

2010-05-06 11:00
2010-05-06 12:00
America/New York
Thursday, 6 May 2010
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 56533 // Password: 0952

   Time:  11 AM - 12 PM EDT

 *--===================================================================--*

I. Agenda:

1) Run10 status / Production priority - Bill / All

2) Forward physics meeting - Nu:  Draft agenda here (pdf file) and Summary

3) BUR11 - Nu

4) TBD 

*--===================================================================--*

II. Brief Summary and/or Action Items:

            1) Attendency: 

III. Note:

► RHIC Planning Meeting Website

► STAR BUR11 Committee: J. Dunlop, O. Evdokimov, C. Gagliardi, B. Mohanty, B. Surrow, E. Schitermann, P. Sorensen, S. Trentalange, N. Xu (chair), Z.B. Xu and the Charge. STAR BUR09 and BUR10.

Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009

► STAR NPE Committee, H. Huang (chair), April 2008

► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report

*--===================================================================--*

IV. Future Meetings and Reviews:

RHIC and AGS User's Annual Meeting: June 7-11, 2010, BNL

STAR Analysis Meeting: June 15-18, 2010, UCLA. Chair: H. Huang

► RHIC PAC Meeting: June 21-23, 2010, BNL

► RHIC Science and Technology Review: June 28-30, 2010, BNL

Spin2010: Sept. 27 - Oct. 2, 2010, Juelich, Germany

► STAR Collaboration Meeting: Oct. 27 - Nov. 1, 2010, BNL. Chair: J. Dunlop

DNP2010: Nov. 3-6, 2010, Santa Fe, NM

Few notes on g2t_ tables

grep g2t_ $STAR/StRoot/St*/{,*}/*.cxx | awk '//{ print $1}' | sort --unique

Approximately 50 places in the code where g2t_ tables are utilized.  Mostly in utility classes, user