STAR Protected

2009 200 GeV SpinDb (full MuDst)

Run list for spinDb deterimination in ~rfatemi/forTJ/FinishedRuns2009  goes from 10111030 - 10180034

 Files located at /star/intitutions/uky/rfatemi/2009Bxing/

TPC OmegaTau

Kinds of laser tracks used:

Detector study 3

   I put the event display which shows the energy deposited in the EEMC tower to project on the EEMC SMD strips.

Condor installation on online Linux pool

Preparation questions for Condor installation:

1.  What machine will be the central manager?

Dijet Filter Performance

I created a dijet Filter using the StMCFilter framework. The filter classifies events into 3 categories: signal, could reconstruct as signal, background.

Speeding up DB access using SSD or Memory

This blog will contain a collection of information on IO tests for speeeding up database access using SSD drives or Ram based disk. A few background information will be provided.

 

Supplementary_Notes_on_Diffraction_MC _March_22_2010

BSMD Calibration Presentation for the Collaboration Meeting

HFTrequirements

2010-03-24 09:00
America/New York
Wednesday, 24 March 2010
BNL , at 13:00 (GMT), duration : 00:00

 The morning session is in room 2-78 for 9-1 and 2-95 from 1-5

The  requirements meeting for the inner structures of the HFT/IST is scheduled for March 24 a Brookhaven, the day before the
FGT meeting also at BNL. The main point of the meeting is to work on the requirements, and move towards a final document that describes
requirements  for the Cone structures, services etc.I enclose here the suggestions from Eric what this meeting should entail.
As you can see it is primarily a working meeting geared towards a specific outcome.

Pre-meeting documents (pulled out from e-mail information). Docs may be added to page later.

Electric:

PXL:

(LGR)

1. preliminary connectivity documentation.
preliminary examples/templates can be found at:
http://rnc.lbl.gov/hft/hardware/docs/PXL_connectivity_description_nc_v1.2.pdf
http://rnc.lbl.gov/hft/hardware/docs/PXL_connectivity_prototype.xls

2. Preliminary grounding documentation.
This should include the grounding plan for the subsystem including a
signal, power, power return and ground paths.

IST (Gerrit)

Overview diagram of IST grounding

 

SSD, (H.Matis) 

See the attached file Cable_Plant_V5.pdf


FGT:

http://www.iucf.indiana.edu/~gvisser/star/fgt/STAR_FGT_Electrical_Connections_and_Grounding_Scheme (.docx)

 http://www.iucf.indiana.edu/~gvisser/star/fgt/STAR_FGT_Electrical_Connections_and_Grounding_Scheme (pdf)

Mechanical:

IDS

requirements spreadsheet  http://web.mit.edu/jason_b/Public/STAR/STAR_IDS_Interfaces_FGT.xls (Jason B.)

 

 

EVO information

 

Title: HFT integration
Description: requirements meeting
Community: STAR
Password: STAR_HFT

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=MaMDMt222nDaDu9e9sDI9a

- Password: STAR_HFT
- Phone Bridge
ID: 1736375
Password: 6311

Eastern Daylight Time (-0400)
Start 2010-03-24  08:30
End   2010-03-24  17:30

- USA (BNL, Upton, NY)
+1 631 344 6100

 

TimeTalkPresenter
09:00Discussion on mechanics ( 01:30 ) 0 files
10:30Disscussion on Electrical Specs ( 01:30 ) 11 files

Run6T FPD Re-Calibration

Run6T FPD Re-Calibration

 

FMS Small Cell Calibration

Detector studies 2

   Following the previous studies,

DiJet Kinematics Derivation

Here I derive the Dijet kinematics equations often quoted.

Run-9 ZDC analysis update

Run QA of pp 2009 200GeV

Objective:

year 4 central event analyses

percolation model

Speaker : Brijesh Srivastava ( Purdue University )


Talk time : 14:30, Duration : 00:30

Offline DB size