unknown

<z> Details

Under:
<z> Details

 

2008.08.26 Shower shape: more constrains for pre1>4E-3 bin

Under:

Ilya Selyuzhenkov August 26, 2008

Data sets:

New Requests

Under:

In the near future we hope to have a dedicated drupal module available for entering embedding (and simulation) requests.

Current Requests

Under:

Current Requests were either submitted using the cgi web interface before it had to be removed (September 2007) or via email to the embedding-hn hypernews list.

Operations

Under:

Request status

- Currently pending requests

- Old Requests summary (circa Nov 2006)

New requests

 

 

01 statistical analysis of 2008 HV

Under:

 Goal: study eta dependence of 2008 BTOW HV


Fig 1 Eta-phi distribution of HV

Run 8 BTOW Calibration (2008)

Under:

 2008 BTOW calibrations 

  1. BTOW HV used in 2008 are in the file »

20 BSMD saturation

Under:

 The isolated BSMD cluster algo allows to select different range of tower energy cluster as shown in Fig.1

general routing for the top and bottom GEM, August 16,

Under:

 these Gerber files  show the general routing for the top and bottom GEM foil layers plus a representative sample of the GE

MIT-RHIC Spin meeting 8/22

Under:

I had mentioned last week that I had found a discrepency in the pre-ecl maker cuts for tower clusters for data and monte carlo.  For Data, I had been using a seed tower of .4GeV and an add Tow