unknown
2008.08.26 Shower shape: more constrains for pre1>4E-3 bin
Submitted by seluzhen on Tue, 2008-08-26 12:57. Under:Ilya Selyuzhenkov August 26, 2008
Data sets:
New Requests
Submitted by starembed on Tue, 2008-08-26 10:25. Under:In the near future we hope to have a dedicated drupal module available for entering embedding (and simulation) requests.
Current Requests
Submitted by starembed on Fri, 2008-08-22 10:25. Under:Current Requests were either submitted using the cgi web interface before it had to be removed (September 2007) or via email to the embedding-hn hypernews list.
Operations
Submitted by starembed on Fri, 2008-08-22 10:16. Under:Request status
- Currently pending requests
- Old Requests summary (circa Nov 2006)
New requests
01 statistical analysis of 2008 HV
Submitted by balewski on Tue, 2008-08-19 16:54. Under:Goal: study eta dependence of 2008 BTOW HV
Fig 1 Eta-phi distribution of HV

Run 8 BTOW Calibration (2008)
Submitted by balewski on Tue, 2008-08-19 15:36. Under:2008 BTOW calibrations
- BTOW HV used in 2008 are in the file »
20 BSMD saturation
Submitted by balewski on Sat, 2008-08-16 20:23. Under:The isolated BSMD cluster algo allows to select different range of tower energy cluster as shown in Fig.1
general routing for the top and bottom GEM, August 16,
Submitted by balewski on Sat, 2008-08-16 19:46. Under:these Gerber files show the general routing for the top and bottom GEM foil layers plus a representative sample of the GE
MIT-RHIC Spin meeting 8/22
Submitted by ahoffman on Fri, 2008-08-15 10:55. Under:I had mentioned last week that I had found a discrepency in the pre-ecl maker cuts for tower clusters for data and monte carlo. For Data, I had been using a seed tower of .4GeV and an add Tow
