- balewski's home page
- Posts
- 2013
- 2012
- 2011
- 2010
- 2009
- December (4)
- November (1)
- October (5)
- September (6)
- August (1)
- July (1)
- June (1)
- May (2)
- April (5)
- March (5)
- February (4)
- January (6)
- 2008
- December (1)
- November (1)
- September (3)
- July (1)
- June (4)
- April (2)
- March (2)
- February (3)
- January (2)
- 2007
- October (1)
- My blog
- Post new blog entry
- All blogs
pp500 W M-C request w/o embedding
Summary of W M-C request for APS
(updated Jan 8, 2010)
Requirements:
- library SL09g, no filtering
- Pythia 6.4.22, p+p 500 GeV
- Tune 320: “Perugia 0” , http://home.fnal.gov/~skands/slides/pythia-atlas-mar09.pdf
- no phase space restriction (interaction w/ the beam pipe will cause more secondaries)
- eta, phi ranges - do not constrain. For Z,W production the x-section dies out quickly w/ eta, minimal CPU benefit
- STAR geometry y2009a, low_sim option for both EMCs, reverse full field
- TPC gains as for 'low HV' working point during pp500 run
- TPC status tables: actual dead padrow map for selected time stamp(s) (TBD 10 time stamp values)
- TPC dEdX similar to real data calibration (low HV) with 10% accuracy
- not possible: TPC points corrections compatible with :"Corr4,OSpaceZ2,OGridLeak3D"
- Beam line offset in GSTAR & BFC : one , the same fixed value for all events x=y=0.
- Vertex distribution in GSTAR:
- transverse : Normal(0 cm, 0.015cm) in X,Y
- Z: Normal(x0=-2cm, sig=42cm) truncated at |Z|<120 cm
- Vertex reco in BFC : use PPV w/ beam line constrain, allow PPV to find all vertices in the M-C event
- Pileup - do not simulate
- Important detectors: TPX (TPC w/ TpcRS), BTOW, ETOW
- other detectors - does not matter
- BTOW calibration set to 'sim' (ideal gains)
- ETOW calibration set to 'missetTCD' - the offline gains for pp500 in run 9
- BTOW, ETOW pedestals - set to 0 - use 'sim' flavor
- BTOW, ETOW status table - real ( drop dead towers according to time stamp, similar to TPC dead padrows)
- save : muDst , geant , log files, fzd, kumac
event type |
Pythia sig (pb) |
# of eve for LT=100/pb |
# of requested MC events |
remarks |
---|---|---|---|---|
W plus prod | 95 | 10K | 20K |
MSEL=12 , MDME1 206=2, W+ ->e+ nu only |
W minus prod | 29 | 3K | 6K |
MSEL=12 , MDME1 206=3, W- ->e- nu only |
W tau | 120 | 12K | 10K |
MSEL=12 , MDME1 208=1, W ->tau nu , both signs |
W jet | 870 | 9K | 10K |
MSEL 14 ! W+/- with jet production ISUB=16,31 |
Z prod | 8 | 1K | 4K |
MSEL 11 ! gamma/Z0 production ISUB=1,96 Z decay to e+ e- |
Z dec | 170 | 2K | 10K | as above, Z decay to all other channels except e+, e- |
QCD pt35 | 5300 | 530K | 100K | no filtering, partonic pt>35 GeV/c |
tot=160K eve | 3 min/eve -> 333 CPU days |
FYI, during pp500 run we acquired LT~10/pb.