run 11 W preparation (take 1)

 Various analysis in preparation of W measurement in 2011

  1. Tuning of the EEMC SF , Ilya 
  2. MTD: 3 trays in run11 (geant tag MUTD04) , 117 trays in run 13 (geant tag MUTD05)
  3. PAC recommendation:  
    1. 4 weeks ppTrans, assume 45% polarization, followed by
    2. 6 weeks ppLong.   assume 50% polarization 
    3. No pp2pp running during Run 11
  4. Background study vs. eta , based on run 9 data, - erased
  5. estimate of LT , FOM, eta slices - erased