RUN15 pptrans calibration status

A. Overall calibration status (RUN15pp200trans):
 
 1. day 66-69, run 16066033 - 16069038 (74 runs) v - calibrated by 1 full iterations (9 iterations)
 2. day 69-73, run 16069039 - 16073021 (102 runs) Δ - 6 iterations done, another full iterations ongoing
 3. day 77-79, run 16077021 - 16079063 (90 runs) v - calibrated by 1 full iterations
 4. day 80-81, run 16080002 - 16081061 (69 runs) v - calibrated by multiple full iterations
 5. day 82-84, run 16082001 - 16084015 (79 runs) Δ - a full calibration is underway
 6. day 85-86, run 16085005 - 16086054 (72 runs) v - calibrated by 1 full iterations
 7. day 87-88, run 16087001 - 16088050 (71 runs) v - calibrated by 1 full iterations
 8. day 89-90, run 16089001 - 16090054 (73 runs) x - continual seg fault error during scheduler
 9. day 91-93, run 16091003 - 16093019 (72 runs) v - calibrated by 1 full iterations

//---------------------------------------------------------------------------------------------------

 B. Reason for delay:

 1. Multiple external interrupts (disk quota, library update, etc) in recent 2-3 weeks
 2. Moved back to PWG disk due to continual quota issue in FPS - Scheduler running speed slowed down noticeably

//---------------------------------------------------------------------------------------------------

C. Brand new calibration results: day 66-69 and day 69-73

  C-1. day 66-69 (iteration finished at June 24)
  - detId= 8: 337/394 (0.8553)
  - detId= 9: 339/394 (0.8604)
  - detId=10: 145/238 (0.6092)
  - detId=11: 176/238 (0.7395)
  -Total: 997/1264 (0.7888)

   C-1-a). Inclusive mass, day 8081 vs. day6669




   C-1-b). Inclusive mass, day 8081 vs. day6669, normalized



   C-1-c). Inclusive mass, day 6669, separated by pair E




  C-2. day 69-73 (iteration finished at July 1, interrupted at i=6 due to disk quota issue)
  - detId= 8: 145/394 (0.3680)
  - detId= 9: 164/394 (0.4162)
  - detId=10:  55/238 (0.2311)
  - detId=11:  59/238 (0.2479)
  - Total: 423/1264 (0.3347)

  C-2-a). Inclusive mass, day 8081 vs. day6973




  C-2-b). Inclusive mass, day 8081 vs. day6973, normalized




  C-2-c). Inclusive mass, day 6973, separated by pair E