EPD Calibration Run20 7.7 GeV FXT

  Please find the calibration process in 1203_dchen_EpdCalibration_R20_7p7GeV.pdf and the calibration value in Nmip_Run_21028011.txt.

The start time and end time of first run (2102811) and last run (21029036) of this calibration: 


STAR RunLog Browser (bnl.gov)