FGT Analysis online QA : QA_Summary for the Week 05/04/13-05/10/13

Day Run # Assembly APV Chips
124 14124014 6AB 7
14124018 6DA 5
14124034 5BC 4-9
125  No Beam    
126  14126013,141266019  6DA  7,
14126014,14126037,14126040 6AB 7
14126045,14126049 5BC 4-9
14126017 1AB 2->No signal
127  14127021,14127047  6AB  2,4
 14127028  6DA  1,7,9
128  14128002,14128003,14128005,14128008,14128017,14128018  6AB  0,3,6,7,2,8
14128005,14128008,14128018 5AB 4-9
129  14129022,14129028  6DA  7,7
14129022,14129029 6AB 7,9
130  Starting from R1413008  1CD  Pedestal Shift(All Chips)
14130009,14130014 6DA 5,9
14130019 6AB 0
14130010 5AB 3
14130014 2DA 0

 

6AB   6DA  Reference Run