- devika's home page
- Posts
- 2018
- May (1)
- 2017
- 2016
- December (1)
- November (1)
- October (1)
- September (4)
- June (2)
- May (2)
- April (5)
- March (4)
- January (3)
- 2015
- 2014
- November (4)
- September (3)
- August (4)
- July (1)
- June (7)
- May (1)
- April (2)
- March (1)
- February (4)
- January (7)
- 2013
- My blog
- Post new blog entry
- All blogs
FullProduction_run2013
Two sets of production
reason:( TPC calibration after day 128 will still take some time since we rely on the HFT dead material modeling to be finished, which has not been finished yet.)
set 1: before day128
set 2 : after day 128
production criteria:
Step 1: Make ‘production request’ for period 1 now with presentation to SPIN PWG on Thursday, January 23
Step 2: Make ‘embedding request’ for period 1 after approval of Step 1
—> First internal analysis of period 1 by Devika and Jinlong for AL
Step 3: Prepare small test production once TPC calibration for Period 2 is available
Step 4: Make ‘production request’ for period 2
Step 5: Make ‘embedding request’ for period 2 after approval of Step 4
—> Analysis of period 2 by Devika and Jinlong for AL
—> Prepare prelim. result of full Run 13 statistic of Period 1 and Period 2!
***********************************************************************************************************************************************************************
Criteria: step 1
Source: http://online.star.bnl.gov/RunLogRun13/
Run Period | Trg SetUP | Magnetic Field | clock source | # of runs | runs excluded | runs included(% to the all runs) |
all | all | all | all | 11531 | ||
pp @ 500 GeV | all | all | all | 11531 | ||
pp @ 500 GeV | Production trigges only | all | all | 3625 | 7906 | |
pp @ 500 GeV | Production trigges only | all | RHIC clock | 3624 | 7907 | |
pp @ 500 GeV | pp500_production_2013 + pp500_production_2013_noendcap |
all | RHIC clock | 2959+119=3078 | 546 | |
pp @ 500 GeV | pp500_production_2013 + pp500_production_2013_noendcap |
Rff(B, -1) | RHIC clock | 2937+119=3056 | 22 | |
Run numbers affected by the luminosity scaler issues [14120013 - 14120016] inclusive
( issue with slow controls communications at the experiment)
Runs that the TPC group has reported is not worth producing: [14126017 14129019] inclusive
reason:
(For this range of runs, another communication failure prevented the TPC voltages from being recorded. This in particular prevents two things: (1) the use of dE/dx (gains are based on voltages), and (2) embedding (embedding depends on knowing the gains of TPC channels). While dE/dx isn't really important for the W analysis, the inability to embed is. This is unfortunately a larger chunk of data, which includes 46 of the runs from our "golden list".)
*******************************************************
runLists:
- devika's blog
- Login or register to post comments