Run 13 W analysis : Official St_WB stream production, P16ig QA

 P16ig  Period 1 :
Production start date : 08/01/16 : http://www.star.bnl.gov/HyperNews-star/protected/get/starsoft/9598.html

Production Details :
 
Tracking : STICA 
P16ig rawData SL16g ry2013_2c DbV20140222 pp2013a StiCA mtd btof VFPPVnoCTB beamline BEmcChkStat -evout Corr4 OSpaceZ2 OGridLeak3D -hitfilt pp 500GeV run 2013 st_W reproduction with StiCA tracking code for days 76-126

QA plots :  Click (here)
P16ig  Period 2 :
P16ig rawData SL16g ry2013_1c DbV20140805 pp2013b StiCA mtd btof VFPPVnoCTB beamline StiHftP BEmcChkStat -evout Corr4 OSpaceZ2 OGridLeak3D -hitfilt  pp 500GeV run 2013 st_W reproduction with StiCA tracking for days 129-161 (part 2) with HFT inclusion to STAR detector

BUG Found : Wrong DbV time stamp used:  DbV20140805  instead DbV20140905.    Whole period 2 needs to be reproduced!!!!
P16ig Period 2 - "rerun"
  A sample of period 2 runs 
Compariosn Plots : 


Period 2 "rerun" vs Period 2.

Click (here)