Run 13 W Analysis : Preliminary Results
Updated on Mon, 2017-11-06 12:07. Originally created by devika on 2016-09-09 08:14.
Run 13 Only :
All STAR (Run 13 & Run 12):
World Data plot:
Run Lists : Period 1 , Period 2
Update
Run 13 Preliminary :
Update
Width of the horizontal band of each point is the width (rms) of the eta distribution. Hight of the horizontal band is the systamtic uncertainity from BEMC calibration.
eps files
Run 13, Run 13+run 12 , Run 13+ Run 12 + PHENIX
Numarical Values
Forward Rapidity:
PWG presentation preliminary release:
Slides
STAR 2013 W AL Preliminary Results
This page state analysis detials of STAR 2013 W AL Preliminary relsuts.Preliminary Results with both Mid-rapidity and forward rapidity Points
Run 13 Only :
- pdf version: Click (here)
- eps version (moneyPlot2013_wtEndcap.eps): Attached on the bottom of the page.
All STAR (Run 13 & Run 12):
- pdf version: Click (here)
- eps version (moneyPlot2013_wtPRL12_wtEndcap.eps): Attached on the bottom of the page.
World Data plot:
- pdf version: Click (here)
- eps version (moneyPlot2013_wtphx_wtEndcap.eps): Attached on the bottom of the page.
Data Set / Production Details
|
Production |
Tracking |
Vertex |
Geometry |
Integral Luminosity |
DATA [st_W stream] |
Period 1 (<day128) : Official, P16ig [ SL16g] Peirod 2 (>day128) : Private, Yuri [TFG16a] |
STICA |
PPV_W |
P1 : y2013_2c P2 : y2013_1c |
125.6 pb-1 |
EMBEDDING |
PYTHIA [6.4.22, perugia-0 ]*st_zerobias Local production - [ SL16f ] |
STICA |
PPV_W |
P1 : y2013_2c P2 : y2013_1c |
~121 pb-1 |
W cuts / Analysis Plots
Update
BG Estimation
Period1 : Period 2Run 13 Preliminary :
AL Caluculations / Plots
Update
Money Plots
Width of the horizontal band of each point is the width (rms) of the eta distribution. Hight of the horizontal band is the systamtic uncertainity from BEMC calibration.
eps files
Run 13, Run 13+run 12 , Run 13+ Run 12 + PHENIX
Numarical Values
<Eta> |
W+ |
W- |
-1.25 |
-0.449 +/- 0.173 |
0.231 +/- 0.177 |
-0.75 |
-0.254 +/- 0.037 |
0.262 +/- 0.062 |
-0.25 |
-0.332 +/- 0.028 |
0.340 +/- 0.071 |
0.25 |
-0.420 +/- 0.028 |
0.237 +/- 0.071 |
0.75 |
-0.559 +/- 0.036 |
0.386 +/- 0.061 |
1.25 |
-0.378 +/- 0.181 |
0.231 +/- 0.177 |
Systamtic Error Calculations
Type | Value | Impact on AL |
- Relative Luminosity
Forward Rapidity:
PWG presentation preliminary release:
Slides
»
- devika's blog
- Login or register to post comments