Run 13 W Analysis : Release of W AL Preliminary Results at INPC 2016 and SPIN 2016 conferences - WorkPlan
Updated on Mon, 2017-11-06 10:30. Originally created by devika on 2016-04-28 16:31.
Carl - Why embedding does not show "eta-dip" ?
Carl - What is the difference between "sign-pt" cut and "away-ET" cut ?
Renee: Z mass width between data and MC?
Elke: How do background numbers compare between Run 11 / Run 12 and Run 13?
Carl: Combination of AL
Carl: pdf’s and uncertainty bands
Renee: Slide 21 / Have numbers available if asked!
Carl: Chi2 comparison between Run 13 and Run 11 + Run 12
Elke: STAR comparison to PHENIX Run 13 as an additional overlay
SPIN 2016 Conference : 25-30 Sep 2016. Urbana, IL, USA
Abstract submission Dead line : July 1st, 2016.
Release of Run 13 W AL Preliminary Results at SPIN 2016 conference - WorkPlan
Presentation to SPIN PWG on 05-09-2016: link : Click (here)Comments :
Carl - Why embedding does not show "eta-dip" ?
Presentation to SPIN PWG on : 08-16-2016 STAR Colloboration meeting link : Click (here)Comments :
Carl - What is the difference between "sign-pt" cut and "away-ET" cut ?
Presentation to SPIN PWG on 08-29-2016: link : Click (here)Comments:
(1): What are the geometry tags? What the correct geometry used? Checking of log files?
(2): In general, showing results from different productions is not really an issue as long as it is understood what the differences are due to!
(3): Away-Cut details? Fractions removed for W+/W- vs. luminosity / charge!
(4): Comparison between AL results / Statistical test comparison
Presentation to SPIN PWG on 09-06-2016: link : Click (here)Comments :
Renee: Z mass width between data and MC?
Elke: How do background numbers compare between Run 11 / Run 12 and Run 13?
Carl: Combination of AL
Carl: pdf’s and uncertainty bands
Renee: Slide 21 / Have numbers available if asked!
Carl: Chi2 comparison between Run 13 and Run 11 + Run 12
Elke: STAR comparison to PHENIX Run 13 as an additional overlay
SPIN 2016 Conference : 25-30 Sep 2016. Urbana, IL, USA
Abstract submission Dead line : July 1st, 2016.
Week | Work Load | Status |
---|---|---|
May [1st-7th] | 1. Finalizing BEMC- ccalibration [will use current STI production] : Emc presentation ; May 3rd 2. Systamtic analysis 3. Calibration NOte |
|
May [8th-14th] | May 8th : Spin PWG presentation requesting fast reproduction using STICA, Disk space |
|
May [15th-21st] | ||
May [22nd-28th] | ||
May 29th - June 4th | ||
June [5th -11th] | ||
June [12th -18th] | ||
June [19th -25th] | ||
June 26th - July 2nd | ||
July [3rd -9th] | ||
July [10th -16th] | ||
July [17th -23th] | ||
July [24th -30th] | ||
July 31st -Aug 6th | ||
Aug [7th- 13th] | ||
Aug [7th- 13th] | ||
Aug [14th- 20th] | ||
Aug [21st- 27th] | ||
Aug [28th- 31th] |
»
- devika's blog
- Login or register to post comments