Run21 EPD 'Live' Calibration day 164-170

Here are my results of calibrating the EPD over days 164-170 of run21. Easier than previous times I've done this; while 3.85 GeV is slightly less well-behaved than 7.7 GeV, we only have to worry about east side as this is a fixed-target mode, and the east side is much nicer than west as far as calibrations go. The only wrinkle was a brief switch to 26.5 GeV fixed-target on day 168; this required some calibrations which may suffer from lack of statistics but should otherwise feels like it calibrated okay. Timestamp for this period are included in the text file.