2nd round with Run XIX calibration production for 19GeV and 14p5GeV samples
Updated on Wed, 2021-04-28 14:04. Originally created by fisyak on 2021-04-28 14:04.
The results on Ks0 and Hyperon reconstruction using 2nd calibration sample (2019_P21ib2) are presented
on
https://www.star.bnl.gov/~fisyak/star/BES/#2019_14p5GeV
https://www.star.bnl.gov/~fisyak/star/BES/#2019_19GeV
No anomalies are observed. With the last production width of Ks0 slightly reduced.
The dE/dx calibration has started. 19GeV looks good (red bullets, express calibration). 14p5GeV requires calibration (black bullets).
»
- fisyak's blog
- Login or register to post comments