Run XVIII AuAu27 part I dE/dx with respect to part II calibration.
Updated on Tue, 2019-06-11 11:10. Originally created by fisyak on 2019-06-11 11:10.
I have compared the results of production on part I AuAu27 dE/dx (RunXVIII201) with respect to the final part II AuAu27 dE/dx calibration (RunXVIII137):
1. Relative dE/dx resolutions versus track length in TPC for part II ( 137) and part I (201) are practically the same.
2. Shifts are compatible.
3. RunXVII137 dE/dx
4. RunXVII201 dE/dx
Conclusion:
The dE/dx calibration done for RunXVIII AuAu27 Part II is working also for Part I.
»
- fisyak's blog
- Login or register to post comments