Status of the express production of Run XXI

 The express production of Run XXI data on HLT farm has been completed. The HLT disk has been released for the Run XXI calibration. The picoDst files from the express production transported to RCF pwg_tasks/tfg02 disk:

Production/statistics/HLT location                          RCF location

________________________________________________________________________________________________________________________________
FF/TFG21c.B/7p7GeV_2021_FF/0.034M
FF/TFG21e/FF_OO_200GeV_2021/6.0M
FF/TFG21f/FF_OO_200GeV_2021/4.9M
RF/TFG21c.B/7p7GeV_2021/163M                         /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21c.B/7p7GeV_2021
                                                                              /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21e/100GeV_fixedTarget_2021
                                                                              /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21e/17p3GeV_2021
RF/TFG21e/3p85GeV_fixedTarget_2021/45.5M     /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21e/3p85GeV_fixedTarget_2021
RF/TFG21e/44p5GeV_fixedTarget_2021/2.91M     /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21e/44p5GeV_fixedTarget_2021
RF/TFG21e/70GeV_fixedTarget_2021/1.6M
RF/TFG21e/70GeV_fixedTarget_2021/2.7M
RF/TFG21e/70GeV_fixedTarget_2021/3.9M
RF/TFG21e/OO_200GeV_2021/3.8M
RF/TFG21e/OO_200GeV_2021/4.0M
RF/TFG21e/ps_OO_200GeV_2021/8.0M                 /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21e/ps_OO_200GeV_2021
                                                                              /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21f/3p85GeV_fixedTarget_2021
                                                                              /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21g/3p85GeV_fixedTarget_2021
RF/TFG21g.B/26p5GeV_fixedTarget_2021/21.7M  /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21g.B/3p85GeV_fixedTarget_2021
RF/TFG21g.B/3p85GeV_fixedTarget_2021/415M   /gpfs01/star/pwg_tasks/tfg02/2021/RF/TFG21g.B/26p5GeV_fixedTarget_2021
RF/TFG21g.B/dAu200_2021/21.7M