Run 10 Calibration Status (2010-08-25)

Production-ready of the AuAu 7 and 11 GeV data sets.

TPC: Anode voltage QA of 39GeV ( Jie Zhao: ~1 week) and 200GeV (Zubayer Ahammed: ~2-3 week) are simulanteously being examined and corrected.

        Open calibration-tasks for 200 GeV: Final Space Charge and Grid Leak (Jie Zhao: ~3-5 weeks) , local and global T0 and Alignment (Maxim Naglis: ~3-5 weeks).        

TOF: Still need some time to examine the channel-by-channel calibration of the 39 GeV dataset.( Kefeng and Joey: ~1 week)

Since there are several calibrations still needing finished for the 200 GeV to be production, it appears that the 39GeV data-set will be ready to be re-produced once the green light is given from the TPC and TOF groups.