Production Priorities Fall 2015

Production Priorities - Fall 2015

with updates In October 2015, Jan. 2016

Input from PWGs

— HF

Run 14
1. Au+Au HFT [done]
2. Au+Au MTD [in progress]
3. Au+Au BHT AuAu_200_production_high_2014 st_physics data stream
4) HFT with SSD readout reproduction
Run 15
5) p+p HFT and MTD (st_mtd w/ HFT readout, st_physics, and st_ssdmb)
6) p+Au (ditto)
 

— Spin

Run 15
1. FMS stream [done]
   pp-trans
   p+Au
   p+Al
   pp-long
2. p+A full stream
3. pp-trans, pp-long full stream
 
 

— UPC

Run 15
1. p+p :: rp-stream [done]
2. p+Au and p+Al ;; rp-stream
3. 2014 UPC stream
 
 

— LFS

FXT data samples
1. Au+Au at 4.5.
2. Au+Al at 4.9.
Run 15 (streams TBD, but likely st_physics and st_mtd)
3. p+Au at 200
4. p+p at 200
5. p+Al at 200
 

— BulkCorr

FXT data samples
1. Au+Au at 4.5.
2. Au+Al at 4.9.
 

— JetCorr

1. Run 15: p+A and p+p high TOF multiplicity data
2. WB stream
 
 

Sources

BulkCorr:

HF:

JetCorr:

LFS

Spin:

UPC: