Minutes for HF PWG meeting on 2014/7/3

We discussed the production priorities for next few months before QM2015. The summary is in http://www.star.bnl.gov/HyperNews-star/protected/get/heavy/4211.html

In short: our top priority is Au+Au 200 GeV run 14 with HFT and MTD detectors for D0 and Upsilon production studies. In addition, for the D0 analysis we need at least half of the st_physics produced to show a high quality results at the QM2015.