ECal Invariant mass plot test for day 027
Updated on Mon, 2022-02-21 01:18. Originally created by liangxl on 2022-02-09 11:49.
- Data set: FCS test run 23027048 (FcsGainCalibration)
- Initial gain correction input: are based on the gain correction after calculating the 2nd iteration gain correction result from day 007 test runs.
- Event selection: 1. each cluster energy > 1 GeV 2. energy asymmetry for cluster pair < 0.7 3. keep the only best cluster pair with highest energy
- Fit function: Gaussian (signal) and power * exponential (background) function to fit for the plot (signal + background)
»
- liangxl's blog
- Login or register to post comments