Det_efficiency
Aug. 14, 2014
IST sensor efficiency
(empty sensors are excluded, bad ones are not rejected)
Excluded ladder 7-14 without hit information.
Efficiency definition: Number of IST associated hits/Number of PXL track projections
Residual & fNhit cuts has been varied to estimate systemically an error range:
(empty sensors are excluded, bad ones are not rejected)
Efficiency definition: Number of IST associated hits/Number of PXL track projections
Ist total efficiency = 80.74%+-0.65%+-3.43%
QA stuff
Ladder IST projections : PXL projections in IST ladders
Apr. 01, 2014
Offline production of zero field cosmic ray data taken from day 38-40 (done by Xin). See linked directory below :
/star/u/dongx/lbl/hft/Run14/Cosmic_Data/
PXL Sensor efficiency in Day 39
Aug. 06, 2014
Offline production of zero field cosmic ray data taken from day 187-188 (done by Mustafa). See linked directory below :
/star/institutions/lbl_prod/mustafa/zf/production/
PXL Sensor efficiency in Day 187
PXL efficiency versus day number (Run14)
Day 97/117 data points are from FullField cosmic-ray data with low statistics.
Day 39 PXL total efficiency 97.2% +-0.5%
Day 97 PXL total efficiency 93.8% +-1.2%
Day 117 PXL total efficiency 96.5% +-0.9%
Day 187 PXL total efficiency 90.8% +-0.4%
QA-Plots : Day 187 ZF data
(By Requiring three pixel hits in straight line tracking and looking at the relative residual of a fourth one)
Bad Sensor removed according to PXLQA plots
http://portal.nersc.gov/project/star/sss/PXL_QA_2014/
Groups:
- malong's blog
- Login or register to post comments