HF-PWG minutes 2016/08/11

 1) Takahito presented the Run-dependent QA for Run15 pp 200 GeV MTD data, and a total of 111 bad runs were identified. 
a. Takahito will circulate the Jpsi->mumu embedding request to the HF list, and Rongrong will make the official request to the embedding team by the end of the next week. 
b. Still some work is needed to extract Psi(2S) signal. Once this is done, Psi(2s) embedding request will be made, and the same raw data can be used as for the Jpsi embedding.
c. Upsilon signal does not look promising for pp. With 1/3 of the pA data analyzed, there is also little Upsilon signal. Some fine tuning of PID cuts can be tried.