calibration delivery timescale1 for Run11

  AV T0/TWIST SC&GL Alignment dE/dx
p+p, 500 GeV, RFF

list of good runs exist (~95%)

done using

LowLumi RFF data

2 weeks for

3 dataset

use Y2000

alignment

parameters

1 week
Au+Au, 19 GeV, RFF list of good runs exist 1 week
Au+Au, 200 GeV, RFF list of good runs exist 1 week
Au+Au, 200 GeV, FF

~1 week

(using FF LowLumi data)

  1week
Au+Au, 27 GeV, FF list of good runs exist   1 week

 

TWIST & T0 should be done before SC

SC&GL ~1 week or less for dataset

dE/dx ~week for each dataset

Anode voltages - list of good runs exist (repairable runs can be added on the time scale of 1-1.5 week)

Hit errors - not adressed, may want to revisit for Run11