Track Correction stuff ...

 

Figure 1: This figure shows the results of the track correction scheme described above for sector 20 FF. There are 15 pannels, each showing the results using a different sagitta shift. The top left pannel shows a sagitta shift of 0.40 cm and the shift increases by 0.02 cm increments until 0.68 cm is reached in the bottom right. The top set of plots show the corrected positive (Red) and negative (Blue) FF track pts. The black curve shows the RFF positive spectra from sector 1 as a reference. The bottom set of plots show the h+/h- ratios for each pannel.

 

Figure 2: This is the same as figure 1 but for sector 5 FF tracks. The sagitta offset starts at 0.1 cm in the upper left pannel and increases in 0.02 cm steps until a shift of 0.38 cm is used in the bottom right pannel.

 

Figure 3: This figure is the same as figure 1 but for sector 4 FF tracks. The sagitta offset starts at 0.1 cm in the upper left pannel and increases in 0.02 cm steps until a shift of 0.38 cm is used in the bottom right pannel.