HF PWG paper plans - 2019/3/22

Analysis   Dataset  PAs  Preliminary  Paper proposal 
to PWG 
PWGC 
preview 
AN and paper 
draft to PWG 
GPC  
request 
  GPC 
review 
Collab review PWG rep.  Note 
                       
Recently published                      
J/psi pp200 cross-section, event activity  Run12 pp200  Bingchu et al.   Y   Y   Y   Y   Y   Y   Y  Rongrong  PL B 786 (2018) 87 (10 Nov 2018)
D0 spectra in AuAu200 Erratum  Run10/11 AuAu200  Yifei et al.  Y  Y   Y   Y   Y   Y   Y  Rongrong  PRL 121 (2018) 229901 (Nov 2018)
D0 spectra in AuAu200  Run14 AuAu200  Guannan/Jakub/Xiaolong/Yifei et al.   Y   Y   Y   Y   Y   Y   Y  Rongrong  PRC 99 (2019) 34908 (20 March 2019)
                       
in GPC or further                      
D0/D* pp500 cross-section  Run11 pp500  David et al.   Y   Y   Y   Y               Y   Y  ongoing Zebo   
J/psi Raa with MTD  Run14 AuAu200  Rongrong/Takahito et al.   Y   Y   Y   Y   Y   Y  ongoing Petr  CR almost done
Low-pT Jpsi excess in AuAu/UU  Run11 AuAu200
Run12 UU193 
Wangmei/Shuai et al.   Y   Y   Y   Y   Y   Y  ongoing Petr  submitted
J/psi pp500&&510 cross-section  Run11+13 pp500  Qian/Te-Chuan/Yi/Zebo et al.   Y   Y   Y   Y   Y   Y  ongoing Petr CR almost done
D0 v1 in AuAu200  Run14+16 AuAu200  Subhash et al.   Y   Y   Y   Y   Y  Y Y  Zebo  submitted
                       
after PWGC preview                      
J/psi pp200 polarization – dielectron  Run12 pp200  Siwei/Bingchu/ et al.   Y   Y   Y  Combined
In 1-3month 
             
J/psi pp200 polarization - dimuon  Run15 pp200  Zhen/Rongrong et al.   Y   Y   Y              
Lc spectra in AuAu200  Run14+16 AuAu200  Guannan/Sooraj et al.   Y   Y   Y  ongoing           targeting PRL
Ups->ee RAA
Run11 AuAu200 Shuai Yang Y close Y combined paper 3-6 weeks         targeting PRL
Ups->uu RAA Run 14+16 Pengfei (MTD group) Y   Y        
Ups→ee pp200 cross section and RpA
Run15 pp+pAu200
Zaochen,Znehyu, Bingchu et al.
Y 2weeks Y           targeting PLB
                       
intention of PWGC preview                      
Ups→ee pp500, event activity run11 pp500 Leszek Kosarzewski  Y    1-2 months            
Ds spectra in AuAu200  Run14 +16 AuAu200  Nasim/Long Zhou/Yifei et al.   Y    1 month                targeting PRL
D0 v2/v3 Run14+16 Yue et al  Y    2-4 months            
D+- spectra in AuAu200  Run14+16 AuAu200  Guannan/Xinyue
Vanek, et al
 Y    Expected to combine into one paper 3-6 months                
D* spectra in AuAu200  Run14+16 AuAu200  Yuanjing et al.   Y                  
D0 spectra  AuAu200  Run16
AuAu200 
Xin Dong et.al              
Charm total
Cross section
Run14+16
AuAu200
Xin Dong et.al after the D-meson paper                
B->Jpsi in AuAu200  Run14+16 AuAu200  Guannan,Bingchu et al.   Y    2-4 months                 
B->D in AuAu200  Run14+16 AuAu200  Xiaolong et al.   Y    2-4 months                  
B->e and D->e in AuAu200  Run 14 AuAu200  Kunsu et al.   Y    2-4 months                  
J/psi→uu RpA pAu200  Run15 pAu200  Rongrong,Takahito et al.   Y    6-9 months                 
D0 in pAu: RpAu+v2 run15 pAu Kramarik, Moravcova     10-12 months            
                       
early stage/planned                      
D0/h v2 event-shape dependence run14 and 16 Yue et al. aiming for
QM 2019
               
b→e Raa and v2 run14 and 16 Mathew Kelsey aiming for
QM 2019
               
Jpsi and Jpsi(2S)->uu   in p500 run17 pp500 MTD group aiming for
QM 2019
               
NPE v2 in 54 GeV Au+Au run17 AuAu 57 Yuanjin Ji aiming for
QM 2019
not started yet              
                       
unknown status/ no response                      
D*-h correlation in pp500  run11 pp500  Long Ma et al.,   Y   Y                   
Psi(2s) -> J/Psi + pipi in pp 200 pp200 Feng-Han, Chan-Jui                  
Upsilon →ee run14 Run14 AuAu200 Leszek,Oliver                  
La_c/aLa_c Run14+16 AuAu200 Simko                  
J/psi v2 in UU193  Run12 UU193  Alena et al.   Y                       
NPE Raa in  UU193  Run12 UU193  Katarina                  
Jpsi polarization pp 500  run11 pp500 Barbara Y                

Previous plans here