W Efficiencies Analysis

 Run11,12, and 13 initial efficiencies using standard W AL cuts with the following changes: Slides (sub-set)

  •  -1 <= eta <= 1
  • signed-pT > 16 GeV
  • 2x2/4x4 ET > 0.96
  • 2x2 ET > 16 GeV
  • 2x2/near cone > 0.82
  • Away ET < 30 GeV (<11 GeV for Run-13 Period 1 only)