Run 23 EPD Commisioning

Commissioning the EPD for run 23 was the job that never ended.  In this post, I will attempt to summarize the actions taken from the end of run 22 through the commissioning with beam of the EPD in run 23.

Removal after Run 22
On April 18th and 19th, the EPD was removed after run 22.  Around this time we noticed that the dark currents are much larger than they were at the start of the run, and