FGT Hardware QA

The updates I make to the spreadsheet with the QA of the FGT hardware, per run, will be linked to this blog.  I wll be covering the period of Monday, Apr. 2 through Thursday, Apr. 5.  The first link has Fills 16667 and 16668, from Monday through Tuesday morning.