Tower E_T Plots -- Updated
This is an update of this other blog. The mock up trigger is removed. A requirement of 1 ETOW above 1 GeV in energy is used for filtering in making the EEmcTrees. A few runs are used for the data, while all the available Pythia is used, including all partonic pT bins, weighted accordingly. Also, the normalization range for the plots with data and MC both is set to 6 to 10 GeV, not 3 to 10 GeV as in the last blog.
The trigger seems to be more harsh in the Pythia sample than in the data.
Groups:
- sgliske's blog
- Login or register to post comments