QT32B Board Change for East EPD 4/11/2019
Updated on Wed, 2019-04-17 09:43. Originally created by skk317 on 2019-04-17 09:43.
There was recently a change to the QT32B board v7a algorithm in determining ADC values (among other things? I'm not familiar with the algorithm). This caused an increase in the ADC positions for East tiles 24-31 in supersectors 1-4. Below are the plots for these for Day 104 (before the change) vs 106 (after the change), as well as for the same PP/TT ranges on the west side. Day 106 does not have a lot of statistics right now, but I hope to update that shortly.
Day 104 EW 0 PP 3 TT 24-31
Day 106 EW 0 PP 3 TT 24-31
Day 104 EW 1 PP 3 TT 24-31
Day 106 EW 1 PP 3 TT 24-31
»
- skk317's blog
- Login or register to post comments