skoby's blog - ETOW and ESMD Crate Timing Curves -- round 3 - March 3., 2013
- EEMC Tower Crate Timing Curves -- round 2 - March 2., 2013
- EEMC Tower Crate Timing Curves - February 28., 2013
- EEMC Timing Crate Curves -- day 14070 - March 12., 2013
- EEMC Timing Crate Curves -- day 14068 - March 9., 2013
- asymmetry: add 7th bins - October 2., 2014
- asymmetry: add 6th bin - October 1., 2014
- Analysis Note: IFF @ 500 GeV - September 18., 2015
- amplitude vs adc -- side strips - October 1., 2012
- amplitude vs adc - September 28., 2012
- <x> and matching ratios after applying partonic pT bin weights - October 14., 2014
- <x> and <z> with weighted partonic pT bins - October 15., 2014
|