- surrow's home page
- Posts
- 2024
- May (1)
- 2018
- 2017
- 2016
- 2015
- 2014
- October (3)
- September (1)
- August (1)
- July (1)
- June (3)
- May (4)
- April (6)
- March (4)
- February (5)
- January (2)
- 2013
- December (2)
- November (1)
- October (1)
- September (4)
- August (6)
- July (11)
- June (8)
- May (5)
- April (5)
- March (11)
- February (4)
- 2012
- December (3)
- November (3)
- October (3)
- September (3)
- August (3)
- July (10)
- June (9)
- May (5)
- April (4)
- March (4)
- February (7)
- January (4)
- 2011
- 2010
- December (2)
- November (4)
- August (2)
- July (3)
- June (6)
- May (4)
- April (4)
- March (8)
- February (6)
- January (4)
- 2009
- My blog
- Post new blog entry
- All blogs
First FGT HV ramp history
Below is a brief summary of the first FGT HV ramping under colliding beam conditions of the various activites
for the owl shift from February 01, 2012 to February 02, 2012:
- Gerrit and I ramped all quarter sections to 3600V around midnight under colliding beams.
- The beams were lost while the quarter sections were on at 3600V - nothing tripped.
- Gerrit ramped then the quarter sections back up to 3600V and left it there for some time and ramped it back down to 2000V (standby).
- With a new fill, the HV was ramped around 01:10AM back to 3600V and then back to 2000V around 02:40AM.
- All quarter sections were at 2000V until 08:00AM when I ramped it to zero.
- Between 02:40AM and 08:00AM several attempts of filling and dumping / beam losses occurred.
- Not a single channel tripped during this time.
- After ramping the quarter sections to zero, I turned the crate off.
Plots for all HV channels along with the beam current and current history are shown below:
Groups: