HV ramp / Power-cycle

 

Procedure in case of persistend DAQ probems with FGT: Power-cycle FGT crate

--> Consult expert before doing this!

 

a) Physics --> Standby (Wait until HV is at standby)

b) Standby --> Off (Wait until HV is at off)

c) Turn crate off and then on

d) Off --> Standby

e) Standby --> Physics