Run 13 W Task List

 
  • Run QA 2013 
    • 1st priority is done
    • 2nd and 3rd priority still to be done (Jinlong and Devika)
  • Test-production : Gene
    • Point of contact from W group: Devika and Jinlong
  • Production and oversight : Gene
    • Point of contact from W group: Devika and Jinlong
  • Production of W TTrees : Jinlong and Devika
  • Spin bits in 2013 DB / Spin QA (After muDST production) 
    • Spin QA completed for whole run list (1st, 2nd and 3rd priority runs)
    • Presentation to Spin PWG on December, 05
    • Determination of offsets : Devika and Jinlong
    • Upload to database
  • BEMC calibration 
    • Tower: Status tables need to be uploaded to DB
    • Tower: Will not wait for new calibration
  • EEMC calibration
    • Tower: Status tables need to be uploaded to DB
    • What is status of SMD status tables / calibration ? Bernd
    • What was done for Run 11 / 12 analysis : Jinlong
  • TPC calibration / Beam line constrain
    • 74-101 : Needs space charge and grid leak calibration : Maxence
    • 102-128 : Before HFT / Done by Maxence : Needs t0 / twist calibration 
    • 129-161 : With HFT - January 2014 / Needs geometry 
  • MC simulation (W / Z / Tau) / Embedding
    • Determine event size for W / Z / Tau : Jinlong
    • Determine Nzerobias : Jinlong
    • Exact embedding production procedure : Jinlong
    • Estimate of disk space : Jinlong
    • Arrange disk space : Bernd
    • Copy DAQ files from HPSS : Devika, Jinlong, Bernd
    • Submit embedding jobs (Output: muDST files) : Devika, Jinlong, Bernd
    • Submit TTree jobs : Devika and Jinlong
    • TPC for zero bias? : Jinlong
    • Dead material status? : Bernd
  • Background determination in ET  (QCD / Z / Tau) 
    • Code? Jinlong
    • 2 independent analyses : Devika, Jinlong
  • Asymmetry analysis /  Relative luminosity
    • Code? Jinlong
    • 2 independent analyses : Devika, Jinlong
  • Polarization : Bernd
  • Theory : Bernd