Task list W/Z 2013 analysis

Task list: W/Z 2013 analysis

Status: June 24, 2013 
  1. Run QA 2013 (QA Team)
  2. Pre-production (Gene)
  3. Production and oversight (Gene / Devika)
  4. Spin bits in 2013 DB (After muDST production) (Devika / Jinlong)
  5. PPV vertex finding (Jinlong)
  6. W/Z analysis code (Jinlong, Devika using existing code)
  7. BEMC calibration (Alice / Danny)
  8. EEMC calibration (Mike)
  9. TPC calibration / Beam line constrain (Gene / Maxence)
  10. Relative luminosity (Devika / Jinlong)
  11. MC simulation (Devika)
  12. Background treatment (Devika / Bernd)
  13. Polarization (Bernd)
  14. Theory (Bernd)
  15. FGT tracking (Akio)