J/\psi spin alignment study in Isobar system
1. J/\psi isobar results for PWG meeting on April 6 2023
Yield extraction details:
as a function of pT and as a function of Centrality
2.J\psi isobar results for PWG meeting on Aug 17 2023
April 6 is based on a tree which did not read out all pico files due to rcf file reading issue.
This time we generated a new tree, and read as much pico files as we can. Also applied nsigmaE correction.
For this two reasons, the raw J/psi yield is increased a lot.
This part we corrected the efficiency, but the event plane resolution correction is still under way.
3. Yield extraction check for QM Sep 2 2023
4. J/psi isobar results for HP PWG meeting on Sep 14 2023, response to the comments
5. Preliminary request
6. J/psi isobar results at FCV PWG meeting on Sep 20 2023, the slides is the same as last weeks HP pwg meeting, response to the comments
- tc88qy's blog
- Login or register to post comments